Pakistan's engineer-first estimator

Build your dream with the precision of a mason's diary.

Upload your architectural drawing (PDF, DWG or image). Our estimators return a line-item BOQ in PKR — cement bags, steel tons, bricks, sand, labor — priced against today's local mandi rates. Delivered in 24 hours.

2,140+
Homes estimated
±2%
Site consumption accuracy
24 hr
Turnaround
10 Marla · Isometric takeoff
Blueprint preview

Estimated Budget · 10 Marla

Rs 84.2L – 92.6L

Mandi trend

▼ 1.4%

Lahore · Cement Rs 1,280/bagSteel Rs 285,000/tonBricks Rs 18/pcKarachi · Cement Rs 1,290Sand Rs 42/cftIslamabad · Crush Rs 118/cftMason Rs 2,400/dayFaisalabad · Bricks Rs 17/pc
Lahore · Cement Rs 1,280/bagSteel Rs 285,000/tonBricks Rs 18/pcKarachi · Cement Rs 1,290Sand Rs 42/cftIslamabad · Crush Rs 118/cftMason Rs 2,400/dayFaisalabad · Bricks Rs 17/pc
01 — Workflow

Four steps from drawing to costed BOQ.

Full process →
01

Upload drawing

PDF, DWG, JPG. Add plot size in marla/kanal and target city.

02

Estimator review

A PEC-registered estimator digitizes rooms, walls, slabs & finishes.

03

Material takeoff

Cement bags, steel tons, bricks, sand — with 5–8% wastage factored in.

04

PKR BOQ delivered

Priced against today's mandi rates in your city. PDF + portal access.

02 — Sample Estimate

We don't give lump sums. We give lists.

Every ton of steel, every bag of cement, every laborer's day is accounted for — measured off your drawing, priced against your city's daily index.

  • District-specific labor rates
  • 5–8% wastage factor applied per material
  • Grade & brand-level material selection (Falcon, Maple Leaf, Amreli)
  • Downloadable PDF signed by lead estimator
Project Ref
DHA-LHR-V5 · 10 Marla
Grey structure + finishing
Total
Rs 8,416,400
Cement (Falcon / Maple Leaf)
1,420 bags
Rs 1,817,600
Deformed Steel — Grade 60
12.4 tons
Rs 3,534,000
First-class bricks (Lahori)
95,000 pcs
Rs 1,710,000
Sargodha crush + Ravi sand
3,800 cft
Rs 462,000
Labor (grey structure)
148 man-days
Rs 892,800
Grey structure completion
03 — Services

Priced for every phase of construction.

Phase 01

Grey Structure

Excavation, foundation, DPC, columns, slabs, walls, roofing. Bricks, cement, steel, sand, crush.

From Rs 2,850/ sq ft
Phase 02

Finishing

Plaster, flooring, tiles, woodwork, paint, electrical, plumbing, sanitary fittings.

From Rs 1,950/ sq ft
Phase 03

Turnkey

End-to-end management from breaking ground to keys handed over. Interior + landscaping included.

Rs 5,200+/ sq ft
04 — Rate transparency

Today's rates. No markups.

We publish the same rates our estimators use. Sourced from Lahore's Ravi Road mandi, Karachi's SITE, and Islamabad's I-9.

Cement (OPC)
Lahore · updated today
Rs 1,280
/ 50kg bag
Deformed Steel
Karachi · updated today
Rs 285,000
/ ton (Grade 60)
First Class Brick
Faisalabad · updated today
Rs 18
/ piece
Sargodha Crush
Lahore · updated today
Rs 115
/ cu ft
Ravi Sand
Lahore · updated today
Rs 42
/ cu ft
Skilled Mason
Islamabad · updated today
Rs 2,400
/ day
05 — Portals

Two portals. One project of record.

Field verified
“Their steel takeoff was within 2% of what we actually consumed on site for a 1-Kanal grey structure in Model Town. No estimator in Lahore has come this close before.”
IS
Ibrahim Siddiqui
Homeowner · Model Town, Lahore
06 — FAQ

Questions homeowners actually ask.

How much does an estimate cost?+

Grey structure estimates start at Rs 8,000 for up to 10 marla. Turnkey BOQs are Rs 25,000. Refunded in full if you build with a partner contractor.

Which cities do you cover?+

Lahore, Karachi, Islamabad, Rawalpindi, Faisalabad, Multan, Gujranwala, Sialkot and Peshawar with live rate feeds. Other cities on request.

Can you read DWG files?+

Yes — AutoCAD DWG/DXF up to version 2024, plus PDF and hand-drawn images. Our estimators digitize scans manually if needed.

How accurate is the estimate?+

Grey structure: ±2–3% of site consumption. Finishing: ±5% due to material grade choices. We show every assumption in the BOQ.

Do you buy materials for me?+

Optional. Through our procurement partners you can order cement, steel and bricks at the mandi rate quoted — delivered to site.

Ready to break ground?

Stop guessing. Upload your drawing tonight — get an engineer-signed BOQ in your inbox by this time tomorrow.